ADAP Features
Simple and User Friendly. Sophisticated and Rich Capabilities of ADAP
Monthly Plan and Master Plan, and Supply/Demand Adjustments
Transparent and Automatic Scheduling Traceability
Linkage to Existing Infrastructural Systems
Lot Control, Traceability
Multi-language: English, Chinese, Korean, Japanese
Quality Management Function New
Monthly Plan, Master Plan, and Supply/Demand Adjustments
Plural levels of planning are available in ADAP, such as a Monthly Plan, to control the production plan based on order forecasts on monthly basis; a Master Plan, a production plan divided on a daily basis based on the Monthly Plan; and Forecast Demand, which controls the production volume based on the forecast.
Equipped with an automated planning function to create master plans based on a monthly plan as well as the manual adjustment function for PSI (Production, Sales, Inventory) that can flexibly change the master plan in accordance with actual customer orders and sales forecasts, ADAP can respond to demand fluctuation promptly in real time and enables consistent management.
Transparent and Automatic Scheduling Traceability
Do you want to know which customer order the mid-product you're working on is for? In ADAP, you can instantly trace the link between PSI throughout the whole process of purchase to production, tell how far production has proceeded for which customer order, and even tell how many products are ready to ship and how long it will take to complete the remaining customer order.
At a time of delay during purchase or production, you can easily trace which workflow would be influenced by the delay. Knowing the impact, you can know which measures to take to recover from the delay. ADAP supports you even during times of urgency.
Linkage to existing infrastructural systems
ADAP can be linked to your existing infrastructural system and ERP. Data import from MES and WMS is also available. ADAP is a PSLX platform supported product. Any linkage and data import/export can be customized according to your needs and specifications.
Lot Control, Traceability
Not only food products, but many of semi-conductors, LCD related products, chemicals, and pharmaceutical products have a use-by date. ADAP stores and manages used-by date information of raw and intermediate materials by lot. Being able to refer to the use-by dates of each material, ADAP can automatically generate production schedules without assigning any expired inventories.
Multi-language: Japanese, English, Chinese, Korean and other languages addible by a Dictionary Function
No worries for a production site abroad and/or foreign staff members.Just click a button and switch to four different languages including English, Chinese, Korean and Japanese in ADAP. You can even add other languages, Thai, Spanish, or any languages you like, by using Dictionary Function. Equipped even with a time zone feature, global operation can be easily managed with ADAP.
Quality Management Function New
The results of quality check can be stored with pass/fail data in ADAP. Both qualitative inspection results (including pass/fail) and quantitative measurements with pass/fail results are stored systematically. The quality check results saved with the number of passed lot and traceability information, all of which would strongly support detecting the cause in case of a defect.