How is ADAP different from a scheduler?

How is ADAP different from a scheduler? Is it a integrated software of MRP and a scheduler?

Answer
Yes. ADAP can handle MRP and daily scheduling synchronously.

ADAP is capable of both material requirement planning (MRP) and scheduling even with load leveling by referring to facility loads. Since they are executed synchronously and not sequentially, the production lead-time is automatically optimized in accordance with facility loads. Thus, an optimized and load-adequate lead-time and production scheduling is achievable at your production sites.